Who We Are

Company Profile

Xinji Aosen Metal Products Co., Ltd. is a subsidiary of Aosen Special Steel Group specializing in metal product manufacturing. Aosen Metal Products uses raw materials from the group and mainly produces prestressed steel strands, galvanized wire, zinc-aluminum alloy wire, spring steel wire, steel wire rope, etc., with an annual comprehensive production capacity of 1.2 million tons. The company has 5 large production workshops, and the factory area is equipped with pickling and phosphating equipment to ensure the product surface is free of rust. The product materials and specifications are complete, supporting customized production.

1200000tons+

Annual comprehensive production capacity

1000employees+

Including more than 150 technical backbone personnel

180,000m2

Factory floor area

800million US dollars

Company operating revenue

Why Choose Us

01

Own Factory: Possesses 5 large production workshops, with factory area covering 180,000 square meters.


Equipped with Pickling and Phosphating Plant Area: 100% of high-carbon steel raw materials undergo pickling process, ensuring surface quality free of rust.


Own Raw Materials: 100% of metal products use company-owned raw materials. Raw material annual capacity is 7 million tons, ensuring stable supply.


High Production Capacity Advantage: Metal products annual capacity of 1.2 million tons. Complete raw material grades and product specifications.

02

Complete Product Certifications: With strong product strength and technical accumulation, the company has won multiple top industry certifications and participated in the formulation of industry standards.


Own Laboratory: Excellent product quality, superior quality, trustworthy. We can conduct product quality testing according to your needs and provide related testing reports.


Support Customer Customization: Customized production according to customer needs.


Worry-Free After-Sales: Office hours Monday to Sunday 8:00-18:00, customer messages responded within two hours.

Development History

2017

Entered the metal products field

Started construction and achieved production simultaneously, laying the foundation for the production base.

2018

Capacity upgrade, opening a new chapter of development

Built new high-capacity hot-dip galvanizing production line, achieving intensive capacity improvement.

2019

Implemented product diversification strategy

Started hot-dip line conversion to electroplating line project, breaking through electroplating steel wire production process bottleneck.

2020

Laid out new track in alloy materials

Pickling and phosphating workshop construction completed, achieving independent pickling and phosphating process for the first time.

2021

Capacity explosion year, perfecting full-category product matrix

1. Alloy production line put into operation, starting high-value-added alloy material production, upgrading from "single capacity" to "scaled + refined" composite capacity.

2. Prestressed steel strand full line put into operation, forming scaled supply capability for infrastructure products, supporting large engineering project order delivery.

2022

Technology breakthrough year

1. Pickling and phosphating workshop innovation: Replaced traditional phosphating process with coating film, reducing ton consumption cost by 37%, saving over 7 million yuan annually, increasing capacity by over 15%, reducing water consumption per ton by about 50%, reducing annual waste slag discharge by 630 tons, achieving dual improvement in environmental efficiency and opening a new track in green production.

2. Phosphating steel wire R&D successful, increasing daily capacity by 12 tons per line, annual increase of 4,300 tons, forming galvanized + phosphating dual high-end product lines.

2023

Deepened cooperation layout with central enterprises

Jointly launched "Transportation Integrated the World" brand with China Communications Construction Group in Metal Phase III, opening a new stage of strategic cooperation in engineering materials.

2024

Pursuing excellence, new journey begins

1. Steel strand overall project capacity first broke through 600,000 tons.

2. Steel wire rope project started, with construction capacity reaching 200,000 tons/year.

2017

2018

2019

2020

2021

2022

2023

2024

Contact Us

Contact Us

Service Hotline:

+86 131 8000 1253

WhatsApp:

+86 131 8000 1253

Company Email:

aosenmetal123@gmail.com

stay in touch

stay in touch

Copyright © Xinji Aosen Metal Products Co.,Ltd. | Sitemap |